Still on a binder?
Start from what you have.
Import the hazard log and training records you already keep, and let guided setup fill in the rest. You don't need to throw anything away to begin.
How switching worksPart 5 readiness
A complete Part 5 SMS with a live readiness tracker that maps every requirement from §5.21 to §5.97 to real evidence from your operation. Guided setup gets you configured in weeks. Daily operation builds the proof.
Part 5 declaration due
May 28, 2027
213days left
Part 5 takes months of real activity, not a weekend of paperwork. Start now and watch your readiness climb.
READINESS CHECK · 15 QUESTIONS
Answer yes, partly or no for each element. You'll see an indicator for each of the four SMS components and the Declaration, and which areas need work first. It takes about three minutes, and nothing you enter leaves this page.
HOW READINESS WORKS
Inside Direct2, readiness isn't a questionnaire. The tracker maps every requirement from §5.21 to §5.97 to real evidence from your operation, so it can't be gamed by setup alone.
THE PATH TO DECLARED
Bring your hazard log, training records and manual from a binder, spreadsheet or another system, with a mapping preview and a reconciliation report. Or start from the templates.
Guided setup builds your manual, policy, accountability register, FRAT model and training assignments from plain questions.
Reports, FRATs, training and a first management review. This is the part that takes months, and the part that counts.
The AE reviews a point-in-time readiness report, then signs the Declaration for your FSDO or CMO.
The FAA acknowledgement is stored with the Declaration. When supporting data is asked for under §5.9(d), produce the evidence package for any date range in one click.
Getting to the Declaration
The Summit Air Charter demo operator has been through it. Every step is in the same record, so the evidence builds itself.
Explore the demo operatorThe safety manager imports the spreadsheet hazard log with the mapping preview, fixes the errors and files the reconciliation report. Their SMS consultant joins on their own consultant seat.
The manual comes from the template. The AE e-signs the policy and the objectives, the accountability register names who may accept which risk, a FRAT model goes live and training is assigned automatically.
The tracker shows where they really stand, and each gap explains why.
Real reports, a first management review and completed training turn the elements green one by one.
The AE generates the point-in-time readiness report, signs the Declaration and stores it with the FSDO's acknowledgement.
The safety manager generates the §5.9(d) evidence package for the date range in one click.
WHERE YOU'RE STARTING FROM
Still on a binder?
Import the hazard log and training records you already keep, and let guided setup fill in the rest. You don't need to throw anything away to begin.
How switching worksAlready declared on another system?
Your past reports, hazards and reviews come with you, so the evidence trail doesn't restart the day you move.
Bring your historyCertificating under §5.9(b)?
New applicants need an SMS as part of certification. Set it up alongside your manuals so it's operating when the inspector looks.
See the full SMSWorking with a consultant?
Consultant seats let your SMS consultant work in your system with their own login, and switch between all of their clients.
For SMS consultantsFree guide
What the Declaration is, who signs it, and an element-by-element checklist you can work through with your team, whatever software you use.
Get the Declaration guideThe FAA acknowledges Declarations; it does not approve them. The readiness tracker is an indicator, not an FAA determination.
Walk through the demo operator's tracker element by element, then see what yours would look like after guided setup.