Scheduling & Dispatch
Build the trip once, check it all the way, bill from what flew.
- AI email-to-quote, a person approves
- Duty & rest engine 135.267
- Two-party release, DO then PIC
About Direct2
Scheduling, safety and maintenance for on-demand Part 135 operators, on one record.
01 · WHO WE ARE
We've flown the trips, worked the phones on the bad days, and kept the binders, spreadsheets and logins that hold a small Part 135 operation together.
We built Direct2 because we wanted one system that understands Part 135: scheduling, safety and maintenance on the same record, with the regulatory math done for you and the decisions left to your people.
Built from [350+ pending] operator workflows across scheduling, safety and maintenance.
02 · WHAT WE BELIEVE
Every trip touches crew, aircraft, safety and billing. So that's where the record starts.
Don't force a rip-and-replace. Keep the tools that work and connect them.
IntegrationsExport everything, any time, without asking us.
Security & data ownershipThe system computes, flags and blocks. A named, qualified person releases, signs and decides.
Duty, rest, currency and airworthiness rules cited to the section they come from.
Why now
The Part 5 SMS Declaration deadline is May 28, 2027. Every Part 135 certificate needs a working SMS, and the FAA acknowledges your Declaration. It doesn't approve it. Small certificates deserve a complete SMS without the enterprise overhead, on the same record as their trips and aircraft.
Check your Part 5 readinessThree modules · one record
Scheduling & Dispatch
Safety · SMS + FRAT
Maintenance
Talk to us
Tell us how your operation runs today. We'll show you how it runs on one record, with your own trips.