Skip to content
Direct2

About Direct2

Built by pilots and operators who were frustrated with the status quo.

Scheduling, safety and maintenance for on-demand Part 135 operators, on one record.

01 · WHO WE ARE

We've done the job this software does.

We've flown the trips, worked the phones on the bad days, and kept the binders, spreadsheets and logins that hold a small Part 135 operation together.

We built Direct2 because we wanted one system that understands Part 135: scheduling, safety and maintenance on the same record, with the regulatory math done for you and the decisions left to your people.

Built from [350+ pending] operator workflows across scheduling, safety and maintenance.

02 · WHAT WE BELIEVE

Five things we won't compromise on.

  • Scheduling sits at the center of the operation.

    Every trip touches crew, aircraft, safety and billing. So that's where the record starts.

  • Connect to what you have.

    Don't force a rip-and-replace. Keep the tools that work and connect them.

    Integrations
  • Your data is yours.

    Export everything, any time, without asking us.

    Security & data ownership
  • The software flags. Your people decide.

    The system computes, flags and blocks. A named, qualified person releases, signs and decides.

  • Real Part 135 logic, written to the regulation.

    Duty, rest, currency and airworthiness rules cited to the section they come from.

Why now

The Part 5 SMS Declaration deadline is May 28, 2027. Every Part 135 certificate needs a working SMS, and the FAA acknowledges your Declaration. It doesn't approve it. Small certificates deserve a complete SMS without the enterprise overhead, on the same record as their trips and aircraft.

Check your Part 5 readiness

Three modules · one record

Run one module or all three. They already talk to each other.

Scheduling & Dispatch

Build the trip once, check it all the way, bill from what flew.

  • AI email-to-quote, a person approves
  • Duty & rest engine 135.267
  • Two-party release, DO then PIC
Scheduling & Dispatch →

Safety · SMS + FRAT

The complete Part 5 SMS, sized for a five-tail certificate.

  • 2-minute FRAT and hazard reports
  • Part 5 readiness tracker
  • One-click inspector evidence
Safety →

Maintenance

The due list your dispatcher can actually see.

  • MEL clocks on the ops board
  • AD alerts within 1 business day
  • Keep your tracker or move in, one tail at a time
Maintenance →

Talk to us

Talk to us.

Tell us how your operation runs today. We'll show you how it runs on one record, with your own trips.